After a long thought, its 12.11AM now, i realise what the QM requested was very much legitimate. 1.) If we repair the track link before it finally breaks, then we don't have replace the track shoes or track links. Other wise, we may have to change both track shoes and links which may lead to higher costs and longer downtime.
2.) If we operate like most quarries in Ipoh, then what are the added advantage that SPH have? We have always pride ourselves with excellent maintenance of the machine, why is this different?
This gave me the impression that Eldest does not want to solve the problems for this QM and seem to want to make his life more difficult. However, i am not in a position to discriminate against any QM for any reasons and the only problem i see for not managing the QM's request and problems is the decrease in production.